Working directly with our customer, Sheffield College at their Olive Grove and Hillsborough sites, SL2 were tasked with the removal of existing automatic doors and associated service controls, before the installation of new curtain walling, automatic doors and door controls to facilitate the arrival of new student intakes.
We tendered the Olive Grove scheme and were appointed to provide a design solution to their existing entrance doors that were working intermittently due to some long-standing design flaws. Works were delivered in time for the new summer intake, and as was the success of this project, this led to us undertaking phase 2 at the Hillsborough campus, which was negotiated and delivered in a much shorter timeframe and all to positive reactions from college staff and students alike.
Key project facts:
- Customer: Sheffield College
- Main contractor: SL2 Ltd
- Sector: Public Sector
- Location: Sheffield. South Yorkshire
- Date: August 2020 & April 2021
- Project duration: 6 Weeks